Non-EU Manufacturer, EU Importer & Authorised Representative Obligations Under the CRA
If your company is headquartered outside the European Union and places a product with digital elements on the EU market, you carry the exact same manufacturer obligations under Article 13 of [Regulation (EU) 2024/2847](https://eur-lex.europa.eu/eli/reg/2024/2847/oj) as an EU-based vendor. The Cyber Resilience Act (CRA) applies by market location, not place of incorporation. Chapter IV has applied since 11 June 2026, and Article 14 vulnerability and incident reporting has already been enforceable since 11 September 2026—including for pre-2027 products under Article 69(3). Full Annex I, conformity assessment, and CE-marking rules take effect on 11 December 2027, per the European Commission CRA implementation factpage.
Updated November 22, 2026
How Attesly keeps CRA evidence per product · Attesly plans and pricing
How CRA Supply-Chain Roles Divide Responsibility (Art. 13, 18–21)
Cross-border hardware, firmware, and software supply chains often stumble when non-EU vendors assume their EU distributor handles compliance. Regulation (EU) 2024/2847 defines distinct duties and Article 64 maximum fines for each economic operator:
| CRA Role | Primary Articles | Core Statutory Duties | Max Administrative Fine (Art. 64) |
|---|---|---|---|
| Manufacturer (EU or Non-EU) | Art. 13, 14, Annex I & VII | Annex I design & vulnerability handling; risk assessment; SBOM; support period; Annex VII file; EU DoC & CE marking; Art. 14 reporting | EUR 15M or 2.5% worldwide turnover (Art. 64(2)) |
| Authorised Representative (EU) | Art. 18 (optional mandate) | Hold EU DoC & Annex VII file for 10 years / support period; supply documents to authorities; cooperate on corrective actions | EUR 10M or 2% worldwide turnover (Art. 64(3)) |
| EU Importer | Art. 19 | Verify conformity assessment, Annex VII file, CE marking, Annex II info & support period; add EU contact details; keep EU DoC copy; escalate risks | EUR 10M or 2% worldwide turnover (Art. 64(3)) |
| Distributor | Art. 20 | Act with due care; verify CE marking, required user instructions, and manufacturer/importer contact details before making available | EUR 10M or 2% worldwide turnover (Art. 64(3)) |
| Rebrand / Substantial Modifier | Art. 21 | Assumes full manufacturer duties if placing a product under its own name/trademark or making a substantial modification | EUR 15M or 2.5% worldwide turnover (Art. 64(2)) |
Supplying incorrect, incomplete, or misleading information to notified bodies or market surveillance authorities carries up to EUR 5 million or 1% of worldwide annual turnover under Article 64(4). Under Article 64(10)(a), microenterprises and small enterprises are exempt from fines for missing the 24-hour early warning deadline, while remaining bound by the reporting duty and 72-hour deadline.
Non-EU Manufacturers: What Cannot Be Delegated (Art. 13 & 18)
Appointing an EU Authorised Representative under Article 18 is optional and requires a written mandate. Crucially, Article 18(2) bars delegating core Article 13 manufacturer duties (Annex I security-by-design, risk assessment, and conformity). Non-EU manufacturers remain directly responsible for:
- Annex I compliance: Security by design and default, machine-readable SBOMs, timely remediation, and free security updates throughout the support period.
- Documentation retention (Art. 13(13)): Keeping Annex VII technical documentation and the EU DoC for at least 10 years after market placement, or for the support period, whichever is longer.
- Article 14 reporting: Filing ENISA Single Reporting Platform notifications for actively exploited vulnerabilities and severe incidents (already active since 11 September 2026).
An Authorised Representative still provides operational value: holding the EU DoC and technical file in the Union, replying to authorities, and anchoring Article 14(7) CSIRT routing.
Article 14(7) CSIRT Routing for Non-EU Manufacturers
Since 11 September 2026, manufacturers must file 24-hour early warnings, 72-hour notifications, and final reports via ENISA's platform (see our Article 14 reporting preparation guide and the European Commission CRA FAQ). Each filing goes to ENISA and one designated national coordinator CSIRT. Article 14(7) defines routing:
- EU-established manufacturer: Member State of the manufacturer's main establishment in the Union.
- Non-EU manufacturer with an Authorised Representative: Member State where the authorised representative is established.
- Non-EU manufacturer without an Authorised Representative: Member State of the importer (or applicable point of contact / Member State of availability under Article 14(7)).
Confirming your coordinator CSIRT beforehand avoids jurisdictional delays during a 24-hour incident window.
EU Importer Verification Checklist & the Article 21 Trap (Art. 19–21)
Under Article 19, an EU importer must verify before placing a non-EU product on the EU market that the manufacturer completed conformity assessment, compiled the Annex VII file, affixed the CE marking, provided Annex II instructions with the support period end date, and included manufacturer traceability details (Article 13(15)–(16)).
The importer must display its own name, registered trade name/trademark, postal address, and email/digital contact on the product, packaging, or accompanying document (Article 19(3)), retain a copy of the EU DoC for 10 years or the support period (Article 19(6)), ensure Annex VII files can be provided on request, and report vulnerabilities or non-compliance. Under Article 21, any EU importer or distributor that white-labels a product under its own brand or makes a substantial modification (such as flashing custom firmware altering security posture) legally becomes the manufacturer with full Article 13, 14, and Annex I obligations.
Preparing Cross-Border CRA Evidence With Attesly
Attesly aligns non-EU engineering teams and EU importers inside one shared product file per product family:
- SBOM monitoring & Art. 14 countdowns: Import CycloneDX, SPDX, or CSV/Excel SBOMs (or automate via the CI SBOM API from Growth upwards) for daily OSV.dev (`purl`) and NVD (`CPE`) matching every 24 hours, email alerts, and 24h/72h Article 14 countdowns.
- Six pre-filled CRA templates & Trust Page: Prepare Annex VII technical documentation, Annex I risk assessments, Annex V/VI EU Declarations of Conformity, Annex II instructions, and CVD policies (with optional EU AI suggestions), publish your approved EU DoC and support end date on a hosted public Trust Page for importer verification, and operate a Vulnerability Intake Page.
- Official CRA source tracking: Monitor regulatory updates directly inside the dashboard.
Clear boundary: Your team decides, reviews, signs, and submits via the official portal; Attesly prepares the evidence and templates—without offering legal advice or automatic compliance certification.
B2B plans are billed monthly with monthly cancellation, no setup fee, and unlimited team members: Starter €/$£ 500/month (up to 5 products), Growth €/$£ 1,500/month (up to 20 products + CI SBOM API), Scale €/$£ 3,000/month (up to 50 products + CI SBOM API), and Enterprise €/$£ 10,000/month (up to 150 products online + CI SBOM API; custom options via /talk). Payment is exclusively via Stripe (3-D Secure card, Apple Pay, Google Pay; no invoice or wire transfer) with a 30-day money-back guarantee (*terms apply).
Ready to streamline cross-border CRA documentation? Try the live demo or review tiers on our pricing page.
Frequently Asked Questions
Must a non-EU vendor appoint an EU Authorised Representative under the CRA?
No. Under Article 18 of Regulation (EU) 2024/2847, appointing an Authorised Representative is optional. However, it can simplify authority correspondence and anchor Article 14(7) CSIRT routing when selling into multiple EU countries.
Can non-EU manufacturers wait until 11 December 2027 to start?
No. Article 14 reporting has applied since 11 September 2026, including for pre-2027 products under Article 69(3). Non-EU vendors need active vulnerability tracking and ENISA reporting readiness today alongside Annex I preparation for December 2027.
Does an EU importer need to hold a full local copy of the Annex VII technical file?
No—under Article 19(6), the importer must keep a copy of the EU Declaration of Conformity for 10 years or the support period and ensure the Annex VII technical documentation can be made available to authorities on reasoned request.
When does an EU importer or distributor become legally liable as a manufacturer?
Under Article 21, an importer or distributor assumes full manufacturer liability if it places the product on the EU market under its own name or trademark or performs a substantial modification to an existing product.